Installation instructions for solar inverter MPPT charging control

Column:Industry News Time:2021-02-25
The installation environment of the solar inverter MPPT charging control is critical to the performance and service life of the controller.

The installation environment of the solar inverter MPPT charging control is critical to the performance and service life of the controller. The solar controller needs to be installed in a dry environment and prevent water infiltration. It is best to ensure sufficient ventilation around the controller and sufficient air flow. Never install the controller in a sealed box. The controller can be installed in the same box as the battery, but ensure that there is no gas or liquid leakage from the battery, because these leaks from the battery will corrode and destroy the controller's circuit.


You can choose to connect multiple solar controllers in parallel and install them on the same battery pack to achieve greater charging current. You can also choose to incorporate a new controller when needed in the future to increase the charging current of the system. However, no matter what the circumstances, it must be ensured that the solar cell arrays connected to each controller are independent of each other, that is, it is strictly forbidden to share the same solar cell array between the controllers.


 Warning: There is a risk of damage or explosion of the equipment!


It is strictly forbidden to directly install the controller and the poorly sealed battery in the same environment. The gas leaking from the battery is flammable and corrosive, and will damage the controller's circuit.


Warning: Risk of equipment damage!



If the solar controller is installed in the box, ensure that there is enough ventilation inside and outside the box. A closed environment will cause the temperature of the controller to rise too high and reduce the service life of the controller.


Before installing the solar controller, please read all installation instructions carefully and operate strictly according to the requirements. Any improper operation behavior may cause the current and voltage output by the controller to fail to meet the required requirements. In serious cases, it may even damage the controller, the battery and the load connected to the controller.



Install spare tools:


l Wire stripper


l Wire cutter


l Phillips screwdriver


l Slotted screwdriver


l vise


l Electric drill


l Level


l Hacksaw (for cutting pipes for protecting wire)




主站蜘蛛池模板: 欧美日韩视频在线一区二区 | 日韩精品一区在线观看 | 内裤奇缘在线 | 四虎永久免费地址在线观看 | 2019自拍偷拍视频 | 国产精品999在线 | 在线看91 | 日本久久久久亚洲中字幕 | 欧美一级黄色片免费看 | 日本天堂免费观看 | 99视屏 | 免费欧洲毛片a级视频 | 久久久久国产精品四虎 | 亚洲精品美女久久久aaa | 91av视频在线播放 | 在线亚洲免费 | 新天堂网| 欧美色乱 | 亚洲日本aⅴ片在线观看香蕉 | 亚洲欧美一区二区三区在线观看 | 日本韩国经典剧情片免费在线 | 美女久久久久久久久久久 | 99热精品69堂国产 | 国产精品.com| 夜夜操天天插 | 天天干天天玩天天操 | 欧美日韩一区二区视频图片 | 九九九精品视频 | 深海免费观看完整版正版 | 亚洲国产精品婷婷久久久久 | 最新国产一区二区精品久久 | 国产福利在线观看永久视频 | 成人黄网大全在线观看 | 欧美高清视频www夜色资源网 | 日本不卡高清免费v | 亚洲欧美国产一区二区三区 | 国产91中文剧情在线观看 | 国产视频麻豆 | 一级毛片免费观看不卡视频 | 91精品在线免费 | 中文字幕在线观看亚洲日韩 |